We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method×リノテック - List of Manufacturers, Suppliers, Companies and Products

Construction method Product List

1~5 item / All 5 items

Displayed results

We present the comprehensive catalog of Renotech Co., Ltd.'s "Net Barrier Method"!

What is the renewal method that simultaneously achieves the prevention of exterior wall peeling and the enhancement of the building's asset value using the "Exterior Wall Composite Renovation Method (NB Method)"?

At Rino Tech Co., Ltd., we offer the "Net Barrier Method (Composite Exterior Wall Renovation Construction Method)" aimed at preventing the peeling of deteriorated mortar-finished exterior walls and tile-finished exterior walls. ☆ Ministry of Construction (now the Ministry of Land, Infrastructure, Transport and Tourism) Technical Evaluation Certified Method [Technical Evaluation No. 96102]☆ 【Contents】 ■ What is the Net Barrier Method (Composite Exterior Wall Renovation Construction Method)? ■ Issues with Conventional Methods ■ Mechanism of the Net Barrier Method ■ Differentiation of the Net Barrier Method ■ Case Studies ■ Needs Examples ■ Expansion of the Net Barrier Method (Benefits) ■ Inquiries *For more details, please download the PDF or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Attention those struggling with the renovation of asbestos-containing coatings! Simultaneously achieve prevention of peeling!

A new proposal to prevent the dispersion of asbestos! What is the 'Net Barrier Method' for preventing exterior wall peeling that can completely renew the building's finish without the need for coating removal?

Are you facing any of these issues with asbestos removal work? ■ Unable to start construction due to lack of manpower... ■ Even if removal is in progress, problems arise during surprise audits, making it difficult to advance the work... ■ Buildings like schools and public facilities bear risks as they cannot extend the construction period... and more. Renotech's self-developed 'Net Barrier Method (Composite Exterior Renovation Construction Method)' will solve these problems! ◎ The 'Net Barrier Method' is a responsible construction method that applies existing techniques, requiring minimal training for managers and workers. ◎ Developed as a pin-net method, it reduces scattering issues by covering rather than removing asbestos. ◎ With minimal substrate treatment, new paint finishes or tile finishes are possible! ◎ Asbestos-related work only requires the removal of the coating using a Φ10.5mm recessed drill before pinning! In some regions, this is considered 'small-scale work' and is exempt from asbestos regulations. ◎ A scattering confirmation test conducted by a third-party organization has been completed! No asbestos detected. ◎ With the legal amendments effective April 2021, regulations for work involving asbestos-containing coatings have been relaxed, making it easier to work. *For more details, please download the PDF or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

External Wall Composite Renovation Construction Method "Net Barrier Method"

Asbestos measures! Compatible with asbestos-containing finishing materials! Prevents the peeling of finishing materials!

The "Net Barrier Method" is a technique aimed at preventing the peeling of deteriorated mortar-finished exterior walls and tiled exterior walls. Before pinning, simply remove the coating using a φ10.5mm recessed drill. *For repairs of weak areas (such as chipping), work should be done while vacuuming with a HEPA filter-equipped vacuum cleaner. It has a peeling prevention effect for the finishing material and enhances the design quality with new finishes. 【Features】 ■ Excellent dust collection using a water-circulating, vibration-free drill ■ Peeling prevention effect ■ No detection of asbestos fibers *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

老朽化した学校施設の長寿命化に『ネットバリヤー工法P1』

文科省が推進する建物の長寿命化に!外壁の剥落防止と新規塗装仕上げを同時かつ高次元で実現!安心の10年保証対応。カタログ進呈中。

現在、文科省により、学校施設の長寿命化改修が推進されています。 建物の深刻な老朽化と厳しい財政状況の中、従来のような建て替えではなく コストを抑えながら建て替え同等の教育環境の確保が求められています。 「ネット上バリヤー工法P1」は外壁のモルタルやタイルの剥落を長期にわたって防止しつつ 新規塗装仕上げによって新築時に近い美観を確保します。 【学校長寿命化改修に選ばれる理由】 ■責任施工体制で確実な施工 ■使用粉体「プレミックスライトフィラー」は混和液不要  (下地調整、ネット張り、上塗り、全てに使用可能) ■「P1ネット」には防弾チョッキにも使われるアラミド繊維を採用 ■アンカーピン「ノックスアンカーKNA」は樹脂注入、打込棒不要 ■作業の簡素化、短い工期で施工効率がUP ■技術審査証明取得工法(BCJ-審査証明-189) ■都市再生機構認定工法 ネットバリヤー工法は、「全国エアロ会」会員による責任施工体制で運営しています。 全国の有資格者による施工及び管理で品質を確保しています。 ※詳しくはPDF資料をご覧いただくか、お気軽にお問い合わせ下さい。

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

学校施設の長寿命化対策に!建て替え不要で建物を一新できる改修工法

25年経過の建物でも10年以上寿命を伸ばせるピンネット工法『ネットバリヤー工法』をご存知ですか?詳細が分かるカタログ進呈

文科省も推奨する<学校施設の長寿命化改修>は、建て替えよりもコストを抑えながら、建て替え同等の教育環境の確保が可能になります。 ただし、外壁の劣化度合いによっては学校の休業期間内に竣工できない場合もあります。特にタイル貼りの外壁では、既設タイルの撤去作業も必要となってきます。 しかし、リノテックが開発した『ネットバリヤー工法』は、既設タイルの上から新しいタイルを貼れる新しいピンネット工法であるため、大幅な工期短縮につながります。 また、高強度な下地施工で10年以上経過した建物でも剝落事故が起きておりません。 【ネットバリヤー工法の特長】 ■責任施工体制で確実な施工 ■産業廃棄物が軽減され、経済的で環境にやさしい ■作業の簡素化、短い工期で施工効率がUP ■現場管理の簡素化が図れる ■建て替え場合と同等の教育環境の確保 ※詳しくはPDF資料をご覧いただくか、お気軽にお問い合わせ下さい。

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration